Description

Reinforcement, formwork and concreting of foundations, bridge decks and superstructures for a new section of the A8 freeway.
The “A8 Intertwining Strip” project was carried out between the Stuttgart interchange and the Leonberg/Ost interchange, including slab renewal and new construction of UF L 1189 in both directions of travel.

Project Details

  • Projekt: A8 freeway intertwining strip
  • Completion date: December 2017
  • Location: Magstadt
  • Sector: Infrastructure

Description

Reinforcement, formwork and concreting of foundations, bridge decks and superstructures for a new section of the A8 freeway.
The “A8 Intertwining Strip” project was carried out between the Stuttgart interchange and the Leonberg/Ost interchange, including slab renewal and new construction of UF L 1189 in both directions of travel.