In addition to the B 30, B 33 and B 467 federal highways, the B 31 is the most important road in the Tübingen region. The project involved the four-lane new construction of the B 31 north of the city of Friedrichshafen on Lake Constance between the entrance to Immenstaad in the west and the already realized B 31 at the Colsmannstraße junction.
Our team contributed to this project on the construction lots 5+7 through shell works: forming and stripping of concrete works for different structural elements (strip and single foundations, columns, slabs, ramps, parapets and insulation), reinforcement work and steel composite work with variable pieces and components, concrete work for all structural elements for demanding functions (vibrations due to traffic and earthwork), assembly of prefabricated reinforced concrete elements with the associated ancillary works (insulation, tronsols).

Project Details

  • Projekt: B31 Baulos 5+7 Immenstadt
  • Completion date: November 2019
  • Location: Friedrichshafen
  • Sector: Infrastructure

Description

In addition to the B 30, B 33 and B 467 federal highways, the B 31 is the most important road in the Tübingen region. The project involved the four-lane new construction of the B 31 north of the city of Friedrichshafen on Lake Constance between the entrance to Immenstaad in the west and the already realized B 31 at the Colsmannstraße junction.
Our team contributed to this project on the construction lots 5+7 through shell works: forming and stripping of concrete works for different structural elements (strip and single foundations, columns, slabs, ramps, parapets and insulation), reinforcement work and steel composite work with variable pieces and components, concrete work for all structural elements for demanding functions (vibrations due to traffic and earthwork), assembly of prefabricated reinforced concrete elements with the associated ancillary works (insulation, tronsols).

Project Details

  • Projekt: B31 Baulos 5+7 Immenstadt
  • Completion date: November 2019
  • Location: Friedrichshafen
  • Sector: Infrastructure